the
project

The works involved the complete strip out and refurbishment of this large 3rd floor office building. Being in the centre of Chester made this project a challenge as the logistics and deliveries needed to be timed to perfection.

This project was all about communication and leadership from the start.

We commenced with the strip out of the floor coverings, electrics and plumbing and then moved onto installing miles of Cat 6 data cables to future proof the office.

A new fire alarm, CCTV, remote door access system and data CAB were installed. A new Saniflow and water heater were installed in the kitchen. New floor tiles, window coverings, office furniture, new reception desk and a full redecoration completed the transformation.

The project was handed over on time and snag free.

Get In Touch

Cannock Office:
Units 4 & 5, Cannock Wood Industrial Estate
Cannock Wood Street, Rawnsley, near Cannock,
Staffordshire, WS12 0PL

Email: [email protected]
Tel: 01543 426811

London Office:
Business Design Centre, Suite 111A,
52 Upper Street, Islington, London, N1 0QH

Email: [email protected]
Tel: 0207 288 6574

Contact Form