The Mill

The Mill Case Study Client:Private ResidenceProject:The MillContract Duration:12 Weeks the project Murray and Willis were appointed to carry out the complete renovation and refurbishment of this Grade II listed former Mill; acquired by an American Music Executive, works were required to be to an exacting standard.  New handmade windows and doors were installed. A new…

HSBC, Boston

HSBC, Boston Case Study Client:HSBC Bank PLCProject:HSBC, Boston ContractContract Duration:14 Weeks the project This project was undertaken over 3 floors within a Grade II listed building and inside a conservation area. The Local Authority was carrying out major highways work directly outside the building and we therefore had to work very closely with both the…

HSBC, Cheltenham

HSBC, Cheltenham Case Study Client:HSBC Bank PLCProject:Major Refurbishment of Flagship BranchContract Duration:16 Weeks the project This project was undertaken in a Grade II listed building over three floors and a basement and involved internal demolition of walls, including the removal of the existing internal lift and shaft. Works included structural alterations and excavations to form…

Bramall Hall, Organ Installation

Bramall Hall, Organ Installation Case Study Client:University of BirminghamProject:Bramall Building, Organ InstallationContract Duration:13 Weeks the project The University of Birmingham entrusted Murray & Willis to supervise and assist with the installation of a prestigious handmade organ into the Bramall Building. We have an excellent long standing relationship with the University of Birmingham, so much so…

Peterborough Museum & Art Gallery

Peterborough Museum & Art Gallery Case Study Client:Peterborough City CouncilProject:Peterborough Museum RefurbishmentContract Duration:20 Weeks the project We were appointed by Peterborough City Council as the main contractor to refurbish one of the city’s most popular attractions: the Peterborough Museum, which annually attracts tens of thousands of visitors. The museum is based in a majestic Georgian…

University Of Birmingham, Fire Precaution and L.V. Rewire

University Of Birmingham, Fire Precaution and L.V. Rewire Case Study Client:University of BirminghamProject:Aston Webb Building Fire Precautions and L.V. RewireContract Duration:14 Months in 2 Phases the project We have completed numerous successful projects over many years for this very well regarded University and the Aston Webb building was yet another, carried out over a fourteen…