HSBC, Broad Street, Worcester

HSBC, Broad Street, Worcester Case Study Client:HSBC Bank PLCProject:Broad StreetContract Duration:6 Weeks the project In addition to the numerous retail projects we have undertaken over many years for this large multi-national ‘blue chip’ client, we also refurbish and fit-out many commercial centres and office projects. The HSBC commercial fit-out in Worcester was a complex refurbishment…

HSBC, Stratford City, London

HSBC, Stratford City, London Case Study Client:HSBC Bank PLCProject:New Flagship BranchContract Duration:12 Weeks the project At 175,000 square metres, Westfield Stratford City, in East London, is one of Europe’s largest indoor retail and leisure centres and was at the heart of the Olympic Park for London 2012. It was at Stratford City where we delivered…

HSBC, Boston

HSBC, Boston Case Study Client:HSBC Bank PLCProject:HSBC, Boston ContractContract Duration:14 Weeks the project This project was undertaken over 3 floors within a Grade II listed building and inside a conservation area. The Local Authority was carrying out major highways work directly outside the building and we therefore had to work very closely with both the…

HSBC, North Street, Guilford

HSBC, North Street, Guilford Case Study Client:HSBC Bank PLCProject:North Street, GuildfordContract Duration:19 Weeks the project This was one of HSBC largest projects outside London and comprised the relocation from one side of town to the other creating a prestigious destination store. In conjunction with London architect Child Graddon Lewis Murray & Willis carried out this…

HSBC, Newport, Shropshire

HSBC, Newport, Shropshire Case Study Client:HSBC Bank PLCProject:Newport, ShropshireContract Duration:10 Weeks the project This Grade II listed building was refurbished in Newport, Shropshire as part of our framework agreement for HSBC. The works included a full refurbishment of the public back office areas of the building, and incorporated the installation of a new internal DDA…

HSBC, The Mall, Stratford Centre, London

HSBC, The Mall, Stratford Centre, London Case Study Client:HSBC Bank PLCProject:AcquisitionContract Duration:14 Weeks the project We were appointed by HSBC to fit-out a new bank branch in the empty shell of a former retail store, over two floors. The new 800 square metre branch followed existing HSBC design standards but there were new features, including…

HSBC, Westfield

HSBC, Westfield Case Study Client:HSBC Bank PLCProject:New Flagship BranchContract Duration:14 Weeks the project At 175,000 square metres, Westfield Stratford City, in East London, is one of Europe’s largest indoor retail and leisure centres and was at the heart of the Olympic Park for London 2012. It was at Stratford City where we delivered a unique…

HSBC, Milton Keynes

HSBC, Milton Keynes Case Study Client:HSBC Bank PLCProject:Office Fit-Out/Conference FacilityContract Duration:8 Weeks the project Amongst the many and varied projects we have undertaken over the last eighteen years for this large multi-national ‘blue chip’ client we also refurbish and fit-out many commercial centres and office projects. The project was located within an existing office facility…

HSBC, Cheltenham

HSBC, Cheltenham Case Study Client:HSBC Bank PLCProject:Major Refurbishment of Flagship BranchContract Duration:16 Weeks the project This project was undertaken in a Grade II listed building over three floors and a basement and involved internal demolition of walls, including the removal of the existing internal lift and shaft. Works included structural alterations and excavations to form…

HSBC Rollout

Bank Refits & Commercial Centre Refurbishments Case Study Client:HSBC Bank PLCProject:Bank Refits & Commercial Centre RefurbishmentsContract Duration:Various the project Murray & Willis have been undertaking HSBC bank refits and commercial centre refurbishments for in excess of fifteen years and 2011 is no exception. The 2011 program includes branch refresh, staff relocations and new site acquisitions,…