The Boltons

The Boltons Case Study Client:Private ResidenceProject:The BoltonsContract Duration:16 Weeks the project Murray & Willis carried out a complete renovation and refurbishment of this privately owned prestigious property, located at the Bolton’s in one of London’s premier locations. Major renovation works were carried out to a number of bedrooms and bathrooms’ including traditional plaster coving that…

The Mill

The Mill Case Study Client:Private ResidenceProject:The MillContract Duration:12 Weeks the project Murray and Willis were appointed to carry out the complete renovation and refurbishment of this Grade II listed former Mill; acquired by an American Music Executive, works were required to be to an exacting standard.  New handmade windows and doors were installed. A new…

Chadwick House

Chadwick House Case Study Client:Birmingham Properties GroupProject:Chadwick HouseContract Duration:12 Weeks the project We tendered this project for an existing client having successfully completed several high end residential projects in London, including a prestigious apartment in Portland Place. As with all residential projects the logistics are often the main issue, working in areas where we are…

Devonshire Mews

Devonshire Mews Case Study Client:Birmingham Properties GroupProject:Devonshire MewsContract Duration:12 Weeks the project We recently completed the refurbishment of a four story property in Devonshire Mews, the west end of London adjacent to Harley Street. The project involved a lot of internal alterations and ‘high quality finish’ work including re-decorating the property from top to bottom along…

Portland Place

Portland Place Case Study Client:Birmingham Properties GroupProject:Portland PlaceContract Duration:17 Weeks the project Murray & Willis have a 25 year history delivering high quality projects and the refurbishment of this ‘high end’ residential apartment in Portland Place within central London is no exception. Due to the high quality of work carried out for the same client…

BPG, Leamington Spa

BPG, Leamington Spa Case Study Client:BPGProject:Leamington SpaContract Duration:16 weeks the project This project involved converting an old restaurant spread across two floors of a four-story building into five luxury apartments in Leamington Spa. As with most residential projects the logistics are often the main concern, working in areas where we are in close proximity of…