University of Birmingham, Bioscience

University of Birmingham, Bioscience Case Study Client:University of BirminghamProject:Refurbishment of LaboratoriesContract Duration:18 Weeks the project In September of 2018 we commenced a project to refurbish the ground floor laboratories in Bioscience on the main university campus for the projects team at Estates West. We refurbished an existing laboratory in room NG6 and converted an existing…

University of Birmingham, Physics West

University of Birmingham, Physics West Case Study Client:University of BirminghamProject:Refurbishment of research rooms and office spacesContract Duration:18 Weeks the project The project consisted of the refurbishment of research rooms and office spaces in two separate areas on the ground floor of the Physics west building. The first phase of the project involved forming new acoustic…

Bilston CE Primary School

Bilston C of E Primary School Case Study Client:Wolverhampton City CouncilProject:New Extension and Fit-outContract Duration:42 Weeks the project Following a successful tender process, Murray & Willis were instructed by Wolverhampton City Council to construct a new build extension of 6000 sq. ft. to Bilston C of E Primary School and then to fit-out the completed…

Kings College London

Kings College London Case Study Client:Kings College LondonProject:James Clerk Maxwell Building, Office RefurbishmentContract Duration:7 Weeks the project We recently completed an office refurbishment project for KCL within the James Clerk Maxwell Building in the Waterloo Campus next to Waterloo station. The project took place on the 5th floor and was completed over three phases in a…

Business Design Centre (London)

Business Design Centre (London) Case Study Client:Business Design CentreProject:Office Refurbishment/RelocationContract Duration:8 Weeks the project Murray & Willis have recently completed the refurbishment of several offices and the relocation of the ‘Executive Centre’ within the highly acclaimed Business Design Centre in Islington, London. This is also the building where our London office is located. This project…

Shire Hotels (North Lakes)

Shire Hotels (North Lakes) Case Study Client:Shire Hotels PLCProject:Refurbishment of Changing Rooms and Leisure FacilitiesContract Duration:15 Weeks the project Murray & Willis have been working with Shire Hotels for a number of years and we have recently completed a refurbishment of the leisure changing facilities at The North Lakes Hotel & Spa, Penrith in the…

HSBC, Broad Street, Worcester

HSBC, Broad Street, Worcester Case Study Client:HSBC Bank PLCProject:Broad StreetContract Duration:6 Weeks the project In addition to the numerous retail projects we have undertaken over many years for this large multi-national ‘blue-chip’ client, we also refurbish and fit-out many commercial centres and office projects. The HSBC commercial fit-out in Worcester, was a complex refurbishment of…

The Boltons

The Boltons Case Study Client:Private ResidenceProject:The BoltonsContract Duration:16 Weeks the project Murray & Willis carried out a complete renovation and refurbishment of this privately owned prestigious property, located at the Bolton’s in one of London’s premier locations. Major renovation works were carried out to a number of bedrooms and bathrooms’ including traditional plaster coving that…

The Mill

The Mill Case Study Client:Private ResidenceProject:The MillContract Duration:12 Weeks the project Murray and Willis were appointed to carry out the complete renovation and refurbishment of this Grade II listed former Mill; acquired by an American Music Executive, works were required to be to an exacting standard.  New handmade windows and doors were installed. A new…

The Meadows Care Home Coalville

The Meadows Care Home Coalville Case Study Client:Priory Group HealthcareProject:The Meadows Care HomeContract Duration:19 Weeks the project The buildings footprint was on two floors and our brief was to totally refurbish the building whilst it was still an operational care home. So to ensure that the service users were not unduly inconvenienced we programmed the…