Aztec Hotel Refurbishment

Contract Duration:

6 Weeks

the
project

We have carried out a number of hotel refurbishments for Shire Hotels over the years and the Aztec Hotel & Spa in Bristol is another milestone in the client’s refurbishment programme.

In a six week phased programme, keeping the hotel fully operational at all times, we undertook the following elements of work:

  • In the reception area we completely sanded down and re-sealed the existing solid oak flooring. We also provided and installed a new reception desk with a deep natural stone surround and decorated throughout
  • We refurbished the lower ground spa reception area where we installed new etched sandblasted glass doors
  • In the ground floor bedroom corridors we installed new lighting, flooring, decoration including moulded decorative wall panels and finished this area off with new illuminated LED bedroom number signs

Following on from this successful project highlighted by the client’s comments, we have successfully negotiated another phase of this project with additional corridor works and a full bar refurbishment which will commence in the new year.

Get In Touch

Cannock Office:
Units 4 & 5, Cannock Wood Industrial Estate
Cannock Wood Street, Rawnsley, near Cannock,
Staffordshire, WS12 0PL

Email: [email protected]
Tel: 01543 426811

London Office:
Business Design Centre, Suite 111A,
52 Upper Street, Islington, London, N1 0QH

Email: [email protected]
Tel: 0207 288 6574

Contact Form