The Mill

The Mill Case Study Client:Private ResidenceProject:The MillContract Duration:12 Weeks the project Murray and Willis were appointed to carry out the complete renovation and refurbishment of this Grade II listed former Mill; acquired by an American Music Executive, works were required to be to an exacting standard.  New handmade windows and doors were installed. A new…

The Meadows Care Home Coalville

The Meadows Care Home Coalville Case Study Client:Priory Group HealthcareProject:The Meadows Care HomeContract Duration:19 Weeks the project The buildings footprint was on two floors and our brief was to totally refurbish the building whilst it was still an operational care home. So to ensure that the service users were not unduly inconvenienced we programmed the…

Dwell Student Living, Bristol

Dwell Student Living, Bristol Case Study Client:Dwell Student Living, BristolProject:Conversion of undercroft car park to a receptionContract Duration:10 Weeks the project This project was located on the outskirts of Bristol and involved the refurbishment of the student accommodation. The scope of works comprised of relaying new concrete slabbing including DPM. Converting a proportion of the…

University College Birmingham, The Maltings

University College Birmingham, The Maltings Case Study Client:University College BirminghamProject:Student accommodation kitchenette replacementContract Duration:12 Weeks the project The project consisted of the refurbishment of 24 student accommodation kitchenettes in 3 separate blocks across the UCB campus. The first phase of the project involved stripping out existing kitchens and removal of old floor coverings. Once the…

24 Old Buildings Lincolns Inn, London

24 Old Buildings Lincolns Inn, London Case Study Client:The Honourable Society of Lincolns InnProject:Office Refurbishment (Barristers Offices)Contract Duration:10 Weeks the project Murray & Willis worked in conjunction with Weightman & Bullen Architects on this prestigious refurbishment of Barristers Chambers. All existing furniture was completely stripped out together with all bookcases and floor finishes. New Mechanical…

33 Chancery Lane, London

33 Chancery Lane, London Case Study Client:The Honourable Society of Lincolns InnProject:Barristers Chambers Office RefurbishmentContract Duration:2 Weeks the project Murray & Willis have an enviable reputation for quality and working with Weightman & Bullen Architects on 33 Chancery Lane in the heart of London was a pleasure. The scope of works included sound resistant partitions…

HSBC, Stratford City, London

HSBC, Stratford City, London Case Study Client:HSBC Bank PLCProject:New Flagship BranchContract Duration:12 Weeks the project At 175,000 square metres, Westfield Stratford City, in East London, is one of Europe’s largest indoor retail and leisure centres and was at the heart of the Olympic Park for London 2012. It was at Stratford City where we delivered…

HSBC, Boston

HSBC, Boston Case Study Client:HSBC Bank PLCProject:HSBC, Boston ContractContract Duration:14 Weeks the project This project was undertaken over 3 floors within a Grade II listed building and inside a conservation area. The Local Authority was carrying out major highways work directly outside the building and we therefore had to work very closely with both the…

HSBC, North Street, Guildford

HSBC, North Street, Guilford Case Study Client:HSBC Bank PLCProject:North Street, GuildfordContract Duration:19 Weeks the project This was one of HSBC largest projects outside London and comprised the relocation from one side of town to the other creating a prestigious destination store. In conjunction with London architect Child Graddon Lewis Murray & Willis carried out this…