HSBC, Milton Keynes

Case Study

Client:

HSBC Bank PLC

Project:

Office Fit-Out/Conference Facility

Contract Duration:

8 Weeks

the
project

Amongst the many and varied projects we have undertaken over the last eighteen years for this large multi-national ‘blue chip’ client we also refurbish and fit-out many commercial centres and office projects.

The project was located within an existing office facility called ‘The Hub’ building on the top floor ‘Penthouse’ level within the well known Midsummer Boulevard in Milton Keynes which was already fitted out to a CAT A specification.

We were employed as the main contractor on a Design & Build basis and instructed the services of A & Q Architects who carried out the internal design. The overall scope of works included a reception and waiting area, three large meeting rooms, conference room with Audio Visual facilities, staff room facilities and a large office area incorporating forty five hot desks with adjacent break out areas.

We also carried out minor electrical and air conditioning works to suit the new office layout.

In keeping with this quality building we furnished it with high quality fixtures and fittings associated with this ‘blue chip ‘client.

Get In Touch

Cannock Office:
Units 4 & 5, Cannock Wood Industrial Estate
Cannock Wood Street, Rawnsley, near Cannock,
Staffordshire, WS12 0PL

Email: [email protected]
Tel: 01543 426811

London Office:
Business Design Centre, Suite 111A,
52 Upper Street, Islington, London, N1 0QH

Email: [email protected]
Tel: 0207 288 6574

Contact Form