Business Design Centre (London)

Business Design Centre (London) Case Study Client:Business Design CentreProject:Office Refurbishment/RelocationContract Duration:8 Weeks the project Murray & Willis have recently completed the refurbishment of several offices and the relocation of the ‘Executive Centre’ within the highly acclaimed Business Design Centre in Islington, London. This is also the building where our London office is located. This project…

Shire Hotels (North Lakes)

Shire Hotels (North Lakes) Case Study Client:Shire Hotels PLCProject:Refurbishment of Changing Rooms and Leisure FacilitiesContract Duration:15 Weeks the project Murray & Willis have been working with Shire Hotels for a number of years and we have recently completed a refurbishment of the leisure changing facilities at The North Lakes Hotel & Spa, Penrith in the…

HSBC, Broad Street, Worcester

HSBC, Broad Street, Worcester Case Study Client:HSBC Bank PLCProject:Broad StreetContract Duration:6 Weeks the project In addition to the numerous retail projects we have undertaken over many years for this large multi-national ‘blue-chip’ client, we also refurbish and fit-out many commercial centres and office projects. The HSBC commercial fit-out in Worcester, was a complex refurbishment of…

The Boltons

The Boltons Case Study Client:Private ResidenceProject:The BoltonsContract Duration:16 Weeks the project Murray & Willis carried out a complete renovation and refurbishment of this privately owned prestigious property, located at the Bolton’s in one of London’s premier locations. Major renovation works were carried out to a number of bedrooms and bathrooms’ including traditional plaster coving that…

The Mill

The Mill Case Study Client:Private ResidenceProject:The MillContract Duration:12 Weeks the project Murray and Willis were appointed to carry out the complete renovation and refurbishment of this Grade II listed former Mill; acquired by an American Music Executive, works were required to be to an exacting standard.  New handmade windows and doors were installed. A new…

The Meadows Care Home Coalville

The Meadows Care Home Coalville Case Study Client:Priory Group HealthcareProject:The Meadows Care HomeContract Duration:19 Weeks the project The buildings footprint was on two floors and our brief was to totally refurbish the building whilst it was still an operational care home. So to ensure that the service users were not unduly inconvenienced we programmed the…

Dwell Student Living, Bristol

Dwell Student Living, Bristol Case Study Client:Dwell Student Living, BristolProject:Conversion of undercroft car park to a receptionContract Duration:10 Weeks the project This project was located on the outskirts of Bristol and involved the refurbishment of the student accommodation. The scope of works comprised of relaying new concrete slabbing including DPM. Converting a proportion of the…

University College Birmingham, The Maltings

University College Birmingham, The Maltings Case Study Client:University College BirminghamProject:Student accommodation kitchenette replacementContract Duration:12 Weeks the project The project consisted of the refurbishment of 24 student accommodation kitchenettes in 3 separate blocks across the UCB campus. The first phase of the project involved stripping out existing kitchens and removal of old floor coverings. Once the…